thermal_power_project

Thermal Power

Construction of Coal Fired Thermal Power Stations usually involves execution of the project on Engineering, Procurement & Construction (EPC) methodology.

The thermal power stations generate electricity by burning coal and using heated/superheated steam. Normally - a thermal power station is broadly classified comprising of Boiler - Turbine - Generator(BTG), normally referred as main plant and Balance of Plant (BoP) comprising of auxiliary equipment required to enable the main plant equipment to work successfully. The BoP comprises of packages as Coal Handling Plant, Ash Handling Plant, Wagon-Tippler, Water System (DM Water, Plant Water, Waste Water Treatment, Effluent Treatment etc), Chimney, etc 

Usually – all the above major equipments are carved into Packages which are then given out to the specialized agencies on EPC Basis conforming to the norms as set in the contract document.

tBits CollabWrite – over the life cycle of the Engineering, Procurement & Construction projects in Industrial Infrastructure development – assists by performing the following functions:

tBits Modules used across the project phases

  1. Correspondence Management
  2. Minutes of Meeting Management
  3. Issue & Task Management
tBits usage in Engineering Phase:
  • Document Control– Management of Basic Engineering documents
  • Tender Documents - including Technical & Commercial Evaluation of Bids
  • Detailed Engineering Documents – Till Good for Construction / Release for construction and till As-Built.
  • Uncontrolled DocumentsSite photographs, Monthly Reports, Adhoc documents etc
  • Modules for documents for C&I.
tBits usage in Procurement Phase
  • Quality Process Automation & collaboration between the Vendors, Third Party Inspection Agencies & Owners including:
  • Inspection Calls Management between Vendor, Contractor, Third Party inspection Agencies and Owner till the release of Material Dispatch Clearance Certificates Generation.
  • Logistics Management
  • Site inspections
  • Material Tracking until reconciliation of material to be handed over to Owner at the end of the project as per contract.
tBits usage in Construction Phase:

Collaboration between Site Office, Project Execution Office & Project Engineering Offices.